Train for the AFOQT and the TBAS.
Twelve subtests, three simulators.

Practice every AFOQT subtest and the TBAS simulators and see how you rank against other applicants.

Frontline Forge dashboard for AFOQT & TBAS: the sidebar of a signed-in account with the AFOQT & TBAS space, its AFOQT and TBAS sections, Statistics, Settings and Messages, next to the cards of the AFOQT subtests and their format.
TBAS retakes
3 tries, 90 days apart
TBAS scores
Never expire
Trained here
All 15 subtests
Every attempt
Ranked vs applicants

Every AFOQT subtest and TBAS simulator, ready to practice.

Or start with the free AFOQT practice test: 165 questions with answers, no account and no clock.

The three TBAS simulators

Airplane Tracking in play: a green reticle locked on a red aircraft over a dark blue field, with the lower lane tracked at the bottom.

Airplane Tracking (ATT / AHTT)

Simulator · 2 min

Keep the gunsight on one airplane with the joystick and the box on the other with the pedals.

It measures your ability to track a moving target in two dimensions, horizontal and vertical.

How the subtest works
Multitasking in play: four panels at once, a word check, an addition to key in, a gauge to hold in the green and four numbered tiles.

Multitasking (MTT)

Simulator · 5 min

Juggle a letter memory drill, arithmetic, a drifting gauge and radio calls, all four at once.

It measures time sharing: keeping several tasks going at once, not arithmetic or memory as such.

How the subtest works
Directional Orientation in play: the aircraft view of a compound and its four parking lots, next to the tracker map with the heading.

Directional Orientation (DOT / UAV)

48 questions

Use the drone's heading on the map to click the parking lot a voice names in the aircraft view.

It measures spatial orientation: you determine the aircraft's position relative to a target.

How the subtest works

And the twelve AFOQT subtests

After every attempt, see where you stand.

Results screen of a practice attempt in the Frontline Forge app: the ranking, given as the share of test-takers outscored, a distribution curve of scores with your score and the median marked, and tiles for total score, time elapsed, average rank and average time.

Ranked against other applicants

Each attempt is ranked against the attempts recorded by applicants training on Frontline Forge, on the same practice test.

Progress curve on the Statistics page of the Frontline Forge app: the ranking of each saved attempt at one subtest, plotted in order on a scale from 0% to 100%.

Track your progress

Every attempt is saved, so you can see where you stand, work on your weak spots, and show up ready.

Train on every subtest.
Know your rank.

See pricing